Select your language

part-construction-worker-with-tools-belt.jpg

A couple of months after the base layer was poured I have completed the top layer of concrete for the patio upper step.

Progress is being made.

 IMG 3457

Not quite as good a surface as I had hoped, clearly the concrete mix was much too dry.

IMG 3458

I do think that I should still be able to install some large tiles on the surface in spite of the irregularities.

Of course I still have the lower part to do, that should be slightly easier as the area is not quite as large.

Before that, the drainage channel has to be installed.

No comments on “Rear patio more progress”

Comments are closed

The comments for this content have been closed automatically; it's been a while since it was published.