The rear patio has moved a little nearer to completion having received the drain channel and concrete base for the slope outside the back doors.

Hopefully, there should be less water ingress into the 'dungeon' but to make it fully watertight we need to get the outside walls fully rendered and painted. Unfortunately, we are still waiting for the quote and a starting date for that work.

20220418 144050

With Janet's help, I managed to get this job done in record time, although there is still a section of this where the concrete was too dry.

But, just as with the raised section, we will be putting ceramic tiles on the floor so the current surface is not too important 😀.

20220418 144112

 