Things have moved forward quite a bit since the dungeon has been sealed from the outside environment.
The bathroom is almost complete and the water supply has been connected.
We ordered the complete bathroom suite from RMM, just as we had done for the tiles.
As seems to be the norm now, there was a delay in actually receiving the items but the goods did arrive. Everything except for the shower cubicle door which had been accidentally omitted from the order by the shop. A visit to Fundão and a polite conversation in the shop left them slightly embarrassed but cleared up the problem and the door was delivered in record time.
Following a short struggle with my nemesis activity (plumbing) and the very sloppy installation work by the aging plumber brought in by Luís way back in November, we now have a second functioning bathroom.
Of course, it is not quite finished, we are still waiting for more things to arrive. For the bathroom, there are two large storage cupboards to install but these should be delivered with the kitchenette from Macambi.
All that remains is a small amount of sealing with silicone and the door to the room to be fitted and the bathroom is good to go.
You are very welcome Erwin, it was nice to see you again.
Thank you for your kind comments, we have worked hard to get this far and there is much more still to do.