Four days of serious hard work (for those doing the work anyway) has brought the new floor to reality. The concrete surface was poured yesterday and it will take at least a few days to cure.

It is so nice to have a flat and level floor in the old building.

IMG 3047

The special hole on the floor is to accommodate a stairway to the lower part of the building.

 IMG 3051

IMG 3039

IMG 3049

The sharp eyed of you will notice the two plastic ice cream tubs on the floor.

Sadly, these are to collect water drips from the leaks in the new roof. It has been raining pretty constantly for a couple of days and, of course, the leaks only appear once the contractor has left the site.

The floor consists of pre-stressed concrete beams with hollow concrete blocks filling the spaces in between. A few rebar strings tie it all together

Here are some images before the concrete surface is applied.

IMG 3019

IMG 3022

In the ground floor area we still have an array of acro props supporting the ceiling. The concrete must have been extremely wet because it seems to be raining under there.

IMG 3035

IMG 3036

The team will return in a week to finish the underside of the floor - or the ceiling depending upon your point of view.

And hopefully it will be still raining outside so they can identify the faults and repair the roof.

One comment on “Floored”

  • Looking good. Don’t let them take the props out too early. When they did our house the garage roof used the same construction. They had to do it twice!!!!

Comments are closed

The comments for this content have been closed automatically; it's been a while since it was published.