After a long delay, apologies, here is the latest instalment in our saga.

Work continues on the back room.

There was a problem with sourcing the insulation that we wanted but another visit to Fundagesso came up with the goods and we could get a move on.

With the metalwork installed for the walls it was time to create a level ceiling.

IMG 2527

Only when you start working at the ceiling height does it become apparent how badly off level the existing ceiling is.

The following image is not skewed or a trick of the camera angle, the ceiling really is 4" (100mm) different from one side of the room to the other.

IMG 2531

40 holes for bushings drilled, 40 hangers cut to length - each one measured due to the ceiling variance and 8 rails installed.

Now it's ready for the electrical tubing to be placed.